CBC Pipeline, Inc. — Cadiz, OH
Equipment: Ditch Witch® JT3020; StraightLine® 4.0 RockEye® Air Hammer System; Sullair 1150 cfm x 350 psi air compressor. The Challenge: CBC Pipeline, Inc. of Goldonna, LA was awarded a multiple bore contract with a combined length of approximately 1300′ between three shots. Each bore plan called for a depth of 20′ and ground conditions consisted … Continued