Kaydyn Directional Drilling — Union City, PA

Equipment: JT2020 and a StraightLine® 4″ Air Hammer System.

Ground conditions: approximately 12 to 18″ of top soil with solid limestone formation underneath.

Project Scope and Requirements: this project consisted of 70 replacement water services. 1″ copper lines were placed under the roadway at a minimum cover of 4′. The bore that is featured was 70′ in length and took just under 2 hours to complete including utility installation.