Job Site Stories: CDL Electric Company, Inc.

Location: Ft. Scott, Kansas Equipment: StraightLine HDD® RockEye 4.0 Hammer System on Vermeer® 23×30, coupled with a Sullair 1150×350 compressor. CDL Electric Company, Inc. received a job to install 4-inch poly pipe for traffic signal power and control cables for the Burlington Northern/Santa Fe Railroad. The job site, located in Fort Scott, Kansas, rested on … Continued